Robert-Bosch-Straße
Siemensstraße / Robert-Bosch-Straße, Münster, Germany
Project
Investor selection process, 2018
Office building
ethical
- The roof terrace with greenery and plants opens to the Dortmund-Ems-Kanal and promotes informal communication
- Equal workplace qualities for all employees
- Creation of an identification point
ecological
- Natural ventilation and illumination
- Targeted use of non-hazardous materials
- Use of recyclable building materials
- The building is complemented by its own mobility concept (electric filling station, carsharing concept)
- Horizontally greened building joint and green roofs in partial areas promote humidification and CO2 neutralization
- Use of geothermal, photovoltaic and water-to-water heat pump using the canal water
- Use of a highly efficient heat recovery system (about 80% heat recovery)
efficient
- Wood-hybrid-construction
- Flexible and future-oriented office use
- Minimization of compulsory points and flexible design of floor layout
- Integrated logistics area as intermediate station for dispatch chains
- Economy due to low operating and investment costs
GFA
approx. 22.000 m²
Design team
Marc Böhnke, Mario Reale, Cordula Schneider
Planer
Alexander Schmitz (visualization), e² energieberatung GmbH (energy concept), Peters + Grau GmbH (model making)
Info
The design is the result of an investor selection process. The property is located in Münster-Hiltrup and is facing the Dortmund-Ems-Kanal. The area has a very good traffic connection to the regional environment. The building design on the approx. 9,300 m² site is planned to be built in two construction phases. The façade consists of a very reduced, minimalist curtain façade. All rooms can be ventilated naturally. The flexible floor layouts can be adapted to different rental requirements. The panorama terrace is accessible to all users and offers a wonderful view over the Dortmund-Ems-Kanal.
New Balance Germany Inc., headquarters
Office and showrooms, Düsseldorf, Germany